CPC E21B 41/0035 (2013.01) [E21B 43/122 (2013.01); E21B 43/14 (2013.01)] | 17 Claims |
12. A gas lift method comprising:
injecting a gas into a first portion of a first annulus uphole of a bypass packer and between a well casing and a main production tubing of a multilateral well, wherein the main production tubing is coupled to a first production tubing disposed in a first lateral leg and a second production tubing disposed in a second lateral leg; and
transferring the gas from the first portion of the first annulus into a first gas tube disposed in a second annulus between the first production tubing and the well casing and into a second gas tube disposed in a third annulus between the second production tubing and the well casing via a main gas tube in communication with the first portion of the first annulus and the first gas tube and the second gas tube, wherein a first portion of the main gas tube is disposed in the bypass packer and a second portion of the main gas tube is disposed in a second portion of the first annulus downhole of the bypass packer.
|