CPC E03F 5/0407 (2013.01) [E03F 2005/0413 (2013.01)] | 15 Claims |
1. A method of installing a floor drain/cleanout, comprising:
positioning a drain/cleanout body comprising a first opening for receiving a finish drain/cleanout;
disposing, on the drain/cleanout body, a cover base of a drain/cleanout cover assembly comprising a second opening for receiving the finish drain/cleanout, wherein a center of the second opening of the cover base is aligned with a center of the first opening of the drain/cleanout body;
threading the finish drain/cleanout through the first opening and the second opening to retain the cover base on the drain/cleanout body;
engaging an upper portion of the drain/cleanout cover assembly with the cover base of the drain/cleanout cover assembly, wherein engaging the upper portion with the cover base defines an enclosed void space above the finish drain/cleanout;
installing a flooring material around at least the upper portion;
removing the upper portion of the drain/cleanout cover assembly from the cover base of the drain/cleanout cover assembly to expose the void space; and
positioning the finish drain/cleanout at a desired height.
|