| CPC H04L 5/0048 (2013.01) [H04B 7/0632 (2013.01); H04B 7/0695 (2013.01); H04L 5/0094 (2013.01); H04L 2025/03783 (2013.01); H04L 27/261 (2013.01); H04L 41/08 (2013.01); H04L 69/24 (2013.01); H04W 28/16 (2013.01)] | 20 Claims | 

| 
               1. A baseband processor configured to cause a user equipment (UE) to: 
            determine: 
                a first number of reference signal resources that the UE supports during an amount of time for one or more of new beam identification or path loss measurement; 
                  whether the UE supports 2 port channel state information reference signal (CSI-RS) for the new beam identification with the first number of reference signal resources; and 
                  whether the UE supports multi-port CSI-RS processing for the path loss measurement with the first number of reference signal resources; 
                transmit, to a base station: 
                an indication of the first number of reference signal resources; 
                  an indication of the support of 2 port CSI-RS for the new beam identification; and 
                  an indication of the support of multi-port CSI-RS for the path loss measurement; 
                receive, from the base station, a 2 port CSI-RS; and 
                perform one or more of the new beam identification or path loss measurement based on the 2 port CSI-RS. 
               |