| CPC E21B 49/088 (2013.01) | 14 Claims |

|
1. A method, comprising:
deploying a formation testing tool string into a wellbore, wherein the formation testing tool string comprises a wireline cable;
performing deep transient testing at a plurality of depths within the wellbore corresponding to a plurality formation zones of interest using a wireline formation testing tool of the formation testing tool string;
disconnecting the wireline cable from the formation testing tool string and extracting the wireline cable out of the wellbore between the deep transient testing and drill stem testing;
performing the drill stem testing using a drill stem testing tool of the formation testing tool string after the deep transient testing; and
extracting the formation testing tool string out of the wellbore after the deep transient testing and the drill stem testing.
|