| CPC E21B 43/283 (2013.01) [E21B 43/40 (2013.01)] | 16 Claims |

|
9. A method for recovery of potash from sedimentary rock, the method comprising:
providing first and second bore holes in fluid communication with a cavity containing ore;
injecting a fluid into the first and second bore holes and cavity; and
subjecting the fluid to fluid pulsing before removing the fluid by inserting a tool configured to generate mechanical pulses into one of the first and second boreholes at a location proximate a clay seam in the sedimentary rock and generating fluid pulses with the tool, wherein the fluid penetrates a wall of the first or second borehole to wet the clay seam.
|