| CPC B29C 64/393 (2017.08) [B29C 64/112 (2017.08); B29C 64/259 (2017.08); B33Y 10/00 (2014.12); B33Y 30/00 (2014.12); B33Y 50/00 (2014.12); G01F 23/14 (2013.01)] | 19 Claims |

|
1. A method of monitoring an amount of building material in a cartridge supplying the building material to a dispensing head of an additive manufacturing system via a building material delivery conduit connecting the cartridge and the dispensing head, the method comprising:
reducing pressure in an anterior of the cartridge by a pump;
introducing gas into a volume containing the building material in said anterior of the cartridge, following said reducing of said pressure;
measuring pressure within the cartridge; and
when said pressure reaches a predetermined level, determining the amount of building material in the cartridge, based on a volume of gas introduced into the cartridge or on a proxy of said volume.
|