CPC E21B 34/066 (2013.01) [E21B 47/12 (2013.01); E21B 2200/05 (2020.05)] | 18 Claims |
15. A method of intervention for a well completion, the method comprising:
deploying a workstring within a first tubing of the well completion, the well completion comprising an electric safety valve and a female inductive coupler positioned along the first tubing, and the workstring comprising an intervention male inductive coupler, a contingency electric safety valve, and a wire extending between and connecting the intervention male inductive coupler and the contingency electric safety valve;
positioning the workstring within the first tubing such that the intervention male inductive coupler is aligned with the female inductive coupler;
transferring power to the contingency electric safety valve via the wire; and
transferring telemetry to and from the contingency electric safety valve via the wire.
|