US 12,065,791 B2
Systems and methods for managing a worksite based on battery power
Francisco Romero, Edina, MN (US); John L. Marsolek, Watertown, MN (US); Brian R. Dershem, Naperville, IL (US); and Jonathan A. Anderson, Maple Grove, MN (US)
Assigned to Caterpillar Paving Products Inc., Brooklyn Park, MN (US)
Filed by Caterpillar Paving Products Inc., Brooklyn Park, MN (US)
Filed on Oct. 11, 2021, as Appl. No. 17/498,104.
Prior Publication US 2023/0113279 A1, Apr. 13, 2023
Int. Cl. E01C 19/48 (2006.01); E01C 19/28 (2006.01); G05B 15/02 (2006.01); E01C 19/02 (2006.01); G06Q 10/0631 (2023.01)
CPC E01C 19/48 (2013.01) [E01C 19/282 (2013.01); G05B 15/02 (2013.01); E01C 19/02 (2013.01); E01C 2301/00 (2013.01); G06Q 10/06315 (2013.01)] 19 Claims
OG exemplary drawing
 
1. A system, comprising:
one or more processors; and
one or more non-transitory computer-readable media storing computer-executable instructions that, when executed by the one or more processors, cause the one or more processors to perform acts comprising:
receiving first data associated with paving material being prepared for a worksite at a paving material plant;
receiving second data associated with a first amount of power within a battery of a machine operating at the worksite;
receiving third data associated with one or more operating parameters of the machine to perform an operation at the worksite;
determining, based at least in part on the first data and the third data, a second amount of power for the machine to complete the operation;
determining that the first amount of power is less than the second amount of power;
determining, based at least in part on the first amount of power being less than the second amount of power, an action to be performed at the worksite or the paving material plant;
causing performance of the action; and
causing a notification of the action to be output on at least one of a first device associated with the machine or a second device associated with the paving material plant.