CPC C09K 8/516 (2013.01) [C09K 8/508 (2013.01); C09K 8/5045 (2013.01); C09K 8/514 (2013.01); C09K 8/80 (2013.01); E21B 33/138 (2013.01); E21B 43/267 (2013.01); C09K 2208/08 (2013.01); C09K 2208/18 (2013.01)] | 28 Claims |
1. A method, comprising:
pumping a first stage consisting essentially of a fracturing pad fluid into a subterranean formation under conditions of sufficient rate and pressure to create at least one fracture in the subterranean formation, the fracturing pad fluid consisting essentially of a carrier fluid and a plurality of bridging particles, the plurality of bridging particles forming a bridge in a fracture tip within a far field region of the formation;
then, pumping a second stage comprising a fluid consisting essentially of a first plurality of fibers into the subterranean formation to form a plug with the plurality of bridging particles directly after pumping the first stage; and
then, pumping a third stage comprising a proppant fluid consisting essentially of a plurality of proppant particles after pumping the second stage.
|