| CPC E21B 43/2607 (2020.05) [H02J 3/14 (2013.01); H02J 3/381 (2013.01); H02J 3/46 (2013.01)] | 4 Claims |

|
1. A system for completing a well, the system comprising:
two or more generators;
a plurality of electric load components, each electric load component powered by the two or more generators; and
a load shedding control panel that monitors the two or more generators and, if at least one of the two or more generators loses functionality, the load shedding control panel deactivates one or more of the plurality of electric load components to reduce an electric load, wherein the load shedding control panel prioritizes an order in which at least one or more of the plurality of electric load components are deactivated,
wherein the plurality of electric load components comprises at least one of an electric drilling rig, one or more hydraulic fracturing pumps, a blender, sand equipment, a hydration unit, a data van, or combinations thereof, and
wherein deactivation of at least one of the blender, the one or more hydraulic fracturing pumps, the sand equipment, the hydration unit, the data van, and/or combinations thereof prevents deactivation of another one of the blender, the one or more hydraulic fracturing pumps, the sand equipment the hydration unit, the data van, and/or combination thereof in response to reduction of the electric load.
|