| CPC E21B 34/16 (2013.01) [E21B 47/12 (2013.01)] | 24 Claims |

|
1. A method, in a well system requiring an intervention job, the method comprising:
transmitting, from a single well control panel on a surface of the Earth, the single well control panel operatively coupled to the well system, a close control signal to a motherbore inflow control valve positioned in the well system at a downhole location in a motherbore, the motherbore inflow control valve configured to control fluid flow from the motherbore into a production tubing extending to the surface;
receiving, at the motherbore inflow control valve, the close control signal;
responsive to receiving the close control signal at the motherbore inflow control valve, closing the motherbore inflow control valve;
transmitting, from the single well control panel, a close control signal to a lateral inflow control valve positioned in the production tubing in the motherbore at a downhole location uphole from the motherbore inflow control valve, the lateral inflow control valve configured to control fluid received in motherbore from a lateral wellbore fluidly coupled to the motherbore in the production tubing;
receiving, at the lateral inflow control valve, the close control signal;
responsive to receiving the close control signal at the lateral inflow control valve, closing the lateral inflow control valve;
transmitting, from the single well control panel on the surface of the Earth, an open control signal to a surface controlled formation isolation valve positioned in the well system at a downhole location from the motherbore inflow control valve and the lateral inflow control valve and configured to control a fluid flow from the motherbore into the production tubing;
receiving, at the surface controlled formation isolation valve, the open control signal;
after receiving the open control signal at the surface controlled formation isolation valve, opening the surface controlled formation isolation valve hydraulically; and
after opening the surface controlled formation isolation valve, facilitating completion of the intervention job through the surface controlled formation isolation valve into the well system.
|