| CPC H04W 24/04 (2013.01) [H04W 28/0247 (2013.01); H04W 28/16 (2013.01)] | 15 Claims |

|
1. A deployment control system, comprising:
at least one processor configured to:
receive, from a camera, an image of a service area;
analyze the image to determine information associated with conditions or future conditions estimated from the conditions in the service area;
determine, based on the information associated with conditions or future conditions estimated from the conditions in the service area to which one or more RUs (Radio Units) in a mobile communication system belong, a placement change regarding at least one NF (Network Function) among NFs in the mobile communication system;
determine, based on the information, an NF to be changed and a placement destination of the NF to be changed; and
executing the placement change by instantiating the NF to be changed at the placement destination, wherein
the service area includes a plurality of cells formed by a plurality of DUs,
the plurality of DUs are connected to the same CU (Central Unit), and
based on determining the plurality of cells are grouped in a plurality of cell groups, the at least one processor is further configured to determine that a UPF (User Plane Function) is the NF to be changed.
|