| CPC E21B 34/16 (2013.01) [E21B 33/127 (2013.01); E21B 33/134 (2013.01); E21B 47/06 (2013.01); E21B 47/07 (2020.05); E21B 47/12 (2013.01)] | 11 Claims |

|
1. An arrangement to evaluate shut-in operations, comprising:
a coiled tubing arrangement;
an adapter connected to the coiled tubing arrangement at a first end;
a cable connected to the adapter at a second end, wherein the cable is installed in the coiled tubing arrangement, the cable comprising:
a top package connected to the coiled tubing arrangement;
a telemetry cartridge connected to the top package;
a carrier with a first modem configured to send and receive signals and data;
a digital hydraulic setting tool connected to the carrier;
an expandable plug connected to the setting tool;
a built-up evaluation shut-in tool connected to the expandable plug; and
a bottom arrangement connected to the shut-in tool, the bottom arrangement configured with valve that may be actuated from a signal.
|