| CPC G05B 19/4155 (2013.01) [G06K 7/1413 (2013.01); G06K 7/1417 (2013.01); G05B 2219/32082 (2013.01)] | 9 Claims |

|
1. A material management method carried out by a material management apparatus, applied to a battery production line, wherein the battery production line is provided with a code scanning system and comprises a plurality of stations, and the code scanning system is configured with a plurality of blocking devices each corresponding to one station and a plurality of code scanning devices each bound to one station, the method comprising:
controlling, after a plurality of battery cells placed on the plurality of stations reach designated code scanning positions, the blocking devices to work in a first working state according to a predetermined sequence, thereby blocking identifications of the battery cells on the corresponding stations;
acquiring code scanning results of the code scanning devices corresponding to the blocking devices for the identifications, respectively, when the blocking devices work in the first working state; and
determining, according to the code scanning results, whether a binding relationship between the code scanning devices and the stations is abnormal.
|