| CPC F42B 39/14 (2013.01) [E21B 43/117 (2013.01); E21B 43/1185 (2013.01)] | 10 Claims |

|
1. A well completion tool, comprising:
a tubular housing;
a charge module comprising at least one explosive charge within the housing;
an initiation module coupled to the housing and comprising a detonator;
a bulkhead module within the housing between the charge module and the initiation module; and
a containment cover secured to the housing and covering the detonator, wherein the containment cover has detection means for detecting discharge of the initiation module before removing the containment cover.
|