| CPC E21B 44/00 (2013.01) [E21B 19/165 (2013.01); E21B 41/00 (2013.01); G05B 15/02 (2013.01); G06F 3/0482 (2013.01); G06F 3/04847 (2013.01); G06F 3/04883 (2013.01); G06F 3/04886 (2013.01); G08B 21/187 (2013.01); H04N 7/181 (2013.01)] | 19 Claims |

|
8. An apparatus comprising:
a control system operable to control a well construction system for performing well construction operations at an oil/gas wellsite according to a well construction plan that comprises project phases, wherein the well construction system comprises a plurality of pieces of equipment, and wherein the control system comprises:
a processor and memory storing a computer program code;
a left touchscreen and a right touchscreen operable via finger contact therewith by a human wellsite operator to enter control commands to control automated operation of one or more of the pieces of equipment; and
a video output device operable to display information indicative of operational status of the well construction system and operable to display a list of operational steps of the well construction operations to be performed, wherein display of the list comprises a concurrent display of two or more of the operational steps and wherein the list of operational steps is accompanied by a field that indicates that the list of operational steps are for one of the project phases,
wherein the control system is further operable to:
receive sensor information from a plurality of sensors of the well construction system;
detect unintended operational events occurring in the well construction system based on the received sensor information; and
upon detecting one of the unintended operational events:
automatically display on the video output device information indicative of operational status of a piece of equipment associated with the detected unintended operational event;
automatically replace the display of the list by display on the video output device of one or more corrective actions accompanied by a field that indicates that the one or more corrective actions are for the detected unintended operational event being of a particular event type; and
automatically cause the well construction system to perform at least one of the one or more corrective actions to counteract the detected unintended operational event.
|