CPC E21D 9/006 (2013.01) [F42D 3/04 (2013.01)] | 16 Claims |
1. A blast hole arrangement structure used for blasting for a rheological soft-weak surrounding rock tunnel, wherein a tunnel section subjected to grouting reinforcement is divided into two parts, that is, an upper half section (1) and a lower half section (2), cutting vibration reduction holes (1-2) used in coordination with cutting holes (1-1) are formed in the upper half section (1), and the cutting vibration reduction holes (1-2) are filled with water bags,
wherein a plurality of first-layer vibration isolation holes (1-7) are formed in a tunnel excavation contour line of the upper half section (1), and the first-layer vibration isolation holes (1-7) are filled with soft mud.
|