| CPC E21B 21/08 (2013.01) [E21B 2200/02 (2020.05); E21B 2200/20 (2020.05); E21B 2200/22 (2020.05)] | 8 Claims |

|
1. A method for optimizing a cleanup of a wellbore, comprising:
designing a mechanical arrangement configured to perform the cleanup of the wellbore, the mechanical arrangement having performance data;
placing the performance data pertaining to the arrangement for the cleanup of the wellbore into a simulator and determining a simulator output for the mechanical arrangement;
feeding the simulator output for the mechanical arrangement into both an emissions engine and a cleanup evaluator to achieve an emissions engine output and a cleanup evaluator output;
inputting the cleanup evaluator output and the emissions engine output into an aggregator to achieve an aggregated solution;
optimizing the aggregated solution through use of a radial basis function to achieve optimized results;
performing the method repetitively for all times related to a choke schedule as well as for different mechanical arrangements, wherein the choke schedule is determined for safe operations at the wellhead and in the wellbore; and
performing a cleanup operation in the wellbore with a one of the mechanical arrangements according to the determined safe choke schedule of the method.
|