CPC H04W 74/0816 (2013.01) [H04W 74/0866 (2013.01)] | 22 Claims |
1. A first base station, comprising:
a control unit configured to notify a terminal device of setting information that indicates both:
information regarding a channel access scheme, and
information regarding a setting for channel sense, wherein
the information regarding the setting for the channel sense indicates information regarding a frame period in the channel access scheme, and
the setting information allows the terminal device to use, as the channel access scheme, at least one of:
a first channel access scheme in which the terminal device executes the channel sense at a first timing, or
a second channel access scheme in which the terminal device executes the channel sense at a second timing,
wherein the setting information includes information indicating establishment of synchronization between the first base station and a second base station.
|