CPC G05F 1/625 (2013.01) [G05F 1/66 (2013.01); H02J 3/14 (2013.01); H02J 3/38 (2013.01); H02J 3/381 (2013.01); H02J 3/388 (2020.01); H01R 13/66 (2013.01); H02J 3/40 (2013.01); H02J 2300/24 (2020.01); Y02B 70/3225 (2013.01); Y02E 10/56 (2013.01); Y04S 20/222 (2013.01)] | 20 Claims |
1. A method comprising:
measuring power provided by a power source;
measuring a power demand of one or more loads receiving power from the power source via one or more smart devices;
comparing the measured power provided by the power source and the power demand of the one or more loads; and
signaling, in response to a determination that the power demand of the one or more loads is greater than a first threshold, a first smart device of the one or more smart devices based on a priority label of a load connected to the first smart device,
wherein, based on the signaling, a switch associated with the first smart device is controlled to disconnect a first load of the one or more loads,
wherein the switch comprises a first electrical connection and a second electrical connection, wherein first electrical connection, the second electrical connection, and the switch are enclosed in a casing designed to be mounted on or in a surface in a premises, and
wherein the second electrical connection is connected to the power source using power lines that are on or in the surface.
|