CPC E02D 3/12 (2013.01) [E02B 3/12 (2013.01)] | 18 Claims |
1. A method for beach escarpment mitigation, the method comprising:
mixing a sand stabilization compound with seawater in a reservoir to form a slurry, wherein the sand stabilization compound is a hydrogel comprising one or more polysaccharides, one or more cross-linking agents, and one or more emulsifiers;
adding the slurry to a conduit carrying sand and seawater;
pumping the slurry, sand, and seawater to a beach; and
creating a new shoreline with the pumped slurry, sand, and seawater.
|