CPC F24F 11/64 (2018.01) [F24F 11/30 (2018.01); F24F 11/32 (2018.01); F24F 11/38 (2018.01); F24F 11/523 (2018.01); F24F 11/58 (2018.01); G05B 19/042 (2013.01); G06N 5/02 (2013.01); G06Q 10/0631 (2013.01); G06Q 10/06395 (2013.01); G06Q 10/20 (2013.01); G06Q 30/018 (2013.01); G06Q 50/163 (2013.01); F24F 2110/10 (2018.01); F24F 2110/20 (2018.01); F24F 2110/40 (2018.01); G05B 2219/25011 (2013.01); G05B 2219/2614 (2013.01)] | 20 Claims |
1. A building management system (BMS) for monitoring and controlling heating, ventilation, or air conditioning (HVAC) parameters in a building, the BMS comprising:
one or more processing circuits comprising one or more memory devices coupled to one or more processors, the one or more memory devices configured to store instructions thereon that, when executed by the one or more processors, cause the one or more processors to:
initialize a predictive model for predicting temperature, pressure, and humidity within a target area and an adjacent area of the building,
receive target area data from a target area sensor array configured to measure temperature, pressure, and humidity of the target area,
receive adjacent area data from an adjacent area sensor array configured to measure temperature, pressure, and humidity of the adjacent area,
execute the predictive model based on the target area data and the adjacent area data to generate a prediction of future temperature, pressure, and humidity within the target area, and
control operation of HVAC equipment to maintain the temperature, pressure, and humidity of the target area within a compliance standard.
|