| CPC B23K 11/0873 (2013.01) [B23K 11/252 (2013.01); B23K 11/36 (2013.01); B23K 31/125 (2013.01); B23K 2101/06 (2018.08)] | 22 Claims |

|
1. A method for monitoring welding of an electric resistance welded steel pipe, wherein the welding includes using a heating unit to heat a portion of the pipe to melt a pair of facing butt end surfaces, the method comprising:
an image acquisition step including capturing, via a camera, a captured image of the electric resistance welded steel pipe while welding the electric resistance steel pipe, the captured image including a V-convergence portion including an edge detection area and a V-convergence point, and a welding portion including a position where a molten steel starts to be discharged from an inside of a wall thickness and a bead;
a determination information acquisition step including image-processing the captured image to obtain determination information, and acquiring, as part of the determination information, a molten length from the V-convergence point to the position where the molten steel starts to be discharged, a molten width of the welding portion, or both the molten length and the molten width;
a determining step including comparing the determination information with a determination threshold value set in advance for each wall thickness of the electric resistance welded steel pipe, and determining whether cold welding has occurred, the cold welding being a welding state in which a full thickness of the welding portion in the wall thickness direction has not melted and a partially un-melted portion remains; and
a controlling step including controlling, via a control device, the heating unit based on a result of the determining step.
|