US 12,346,381 B2
Building management system with semantic model integration
Kunal Saini, Brookfield, WI (US); Gerald A. Asp, Milwaukee, WI (US); Matthew T. Trawicki, Franklin, WI (US); and Craig A. Lind, Milwaukee, WI (US)
Assigned to Tyco Fire & Security GmbH, Neuhausen am Rheinfall (CH)
Filed by Tyco Fire & Security GmbH, Neuhausen am Rheinfall (CH)
Filed on Mar. 21, 2024, as Appl. No. 18/612,722.
Application 18/612,722 is a continuation in part of application No. 17/940,176, filed on Sep. 8, 2022, granted, now 11,954,154.
Application 17/940,176 is a continuation in part of application No. 17/872,705, filed on Jul. 25, 2022, granted, now 11,741,165.
Application 17/872,705 is a continuation of application No. 17/039,364, filed on Sep. 30, 2020, granted, now 11,397,773.
Prior Publication US 2024/0232264 A1, Jul. 11, 2024
This patent is subject to a terminal disclaimer.
Int. Cl. G06F 16/00 (2019.01); G06F 3/04842 (2022.01); G06F 16/28 (2019.01); G06F 16/9035 (2019.01); G06F 16/9038 (2019.01); G06F 16/906 (2019.01)
CPC G06F 16/9035 (2019.01) [G06F 3/04842 (2013.01); G06F 16/28 (2019.01); G06F 16/9038 (2019.01); G06F 16/906 (2019.01)] 20 Claims
OG exemplary drawing
 
1. A building management system (BMS) comprising:
one or more memory devices having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations comprising:
ingesting semantic information associated with a plurality of BMS objects;
classifying the plurality of BMS objects into a plurality of predetermined classifications that pertain to the plurality of BMS objects using the semantic information;
updating a semantic site model for a building site by including at least one of the semantic information associated with the plurality of BMS objects or the plurality of predetermined classifications that pertain to the plurality of BMS objects; and
adjusting a plurality of parameters associated with the plurality of BMS objects using the semantic site model.