| CPC E21B 49/10 (2013.01) [E21B 49/0875 (2020.05); G01N 21/01 (2013.01); G01N 21/05 (2013.01); G01N 21/78 (2013.01)] | 19 Claims |

|
1. A system to separate multiphase flows in a main flowline of a downhole fluid sampling and analysis tool comprising a cartridge, wherein the cartridge is a three-dimensional barrier permeable to water and repelling oil and/or drilling mud filtrate into at least one bypass channel within the main flowline of the downhole fluid sampling and analysis tool.
|