CPC G01R 35/04 (2013.01) [G01R 22/065 (2013.01)] | 20 Claims |
1. A method, comprising:
obtaining a configuration associated with at least one metering component installed at a site to be metered;
detecting phase assignment of the at least one metering component based at least on the configuration including by:
detecting a phase assignment of a first metering component associated with a first line including by:
discharging a battery by a predefined power amount on the first line; and
determining that the first metering component associated with the first line detects a change, wherein the change is within a pre-defined deviation from the predefined power amount; and
detecting a phase assignment of a second metering component associated with a second line including by:
discharging the battery by the predefined power amount on the second line; and
determining that the second metering component associated with the second line detects the change, wherein the change is within a pre-defined deviation from the predefined power amount; and
outputting information associated with the at least one metering component.
|