CPC C04B 16/02 (2013.01) [C04B 22/02 (2013.01); C04B 28/04 (2013.01); C04B 28/12 (2013.01); E04C 1/41 (2013.01); C04B 2103/63 (2013.01); C04B 2111/00155 (2013.01); C04B 2201/50 (2013.01); E04B 2103/02 (2013.01)] | 25 Claims |
1. A method of applying a sprayable hemp-based concrete composition, the method comprising:
spraying a hemp-based concrete composition on a surface, the hemp-based concrete composition comprising:
hemp,
at least one mineral, and water, wherein a v/v ratio of hemp to mineral(s) is from 1:100 to 1:1.
|