CPC G05B 19/042 (2013.01) [G06N 3/08 (2013.01); G06N 5/022 (2013.01); G05B 2219/25011 (2013.01)] | 16 Claims |
1. A building management system, comprising:
one or more memory devices configured to store instructions thereon that, when executed by one or more processors, cause the one or more processors to:
access a library of neural network models associated with a plurality of different business vertical categories;
retrieve a first neural network model from the library based on a first business vertical category associated with the building management system, wherein the first neural network model is trained on building operation data of a previous time period, wherein the building operation data of the previous time period is associated with the first business vertical category;
generate, using the first neural network model, a control decision for equipment operated by the building management system; and
control the equipment to affect a physical condition of a building in accordance with the control decision.
|