US 12,013,137 B2
Heating, ventilation, and air conditioning system and method
Damien Semel-DeFeo, New Paltz, NY (US)
Assigned to GeoFlo Cooling, Inc., New Paltz, NY (US)
Filed by Geoflo Cooling, Inc., New Paltz, NY (US)
Filed on Nov. 10, 2023, as Appl. No. 18/507,003.
Claims priority of provisional application 63/452,236, filed on Mar. 15, 2023.
Claims priority of provisional application 63/424,508, filed on Nov. 11, 2022.
Prior Publication US 2024/0159420 A1, May 16, 2024
Int. Cl. F24F 11/00 (2018.01); F24F 8/10 (2021.01); F24F 8/22 (2021.01); F24F 11/72 (2018.01); F24F 110/10 (2018.01)
CPC F24F 11/72 (2018.01) [F24F 8/10 (2021.01); F24F 8/22 (2021.01); F24F 2110/10 (2018.01)] 19 Claims
OG exemplary drawing
 
1. An air conditioning system having a computing or wiring based control system, comprising:
one or more thermostats, configured to sense a temperature at a location of the thermostat in a building, and to sense a temperature in a basement of the building;
a main return duct;
a basement supply duct and a basement return duct, each connected on one end to said main return duct, and each opening on another end to said basement;
dampers for controlling air flow through said main return duct, said basement supply duct, and said basement return duct; and
a supplemental ground loop connected to said basement.