CPC F16L 1/0243 (2013.01) [B05B 13/0278 (2013.01); C22B 3/02 (2013.01); F16L 3/012 (2013.01); F16L 3/18 (2013.01)] | 36 Claims |
1. A system for vertical deployment of leaching lines onto a slope of a mine, comprising:
an elevated guidewire having a first end disposed at a top of the slope and a second end disposed at a bottom of the slope; the elevated guidewire being elevated above a surface of the slope;
a deployment apparatus moveably coupled to the elevated guidewire and having one or more attachment mechanisms disposed thereon; and
one or more leaching lines coupled to the one or more attachment mechanisms; wherein movement of the deployment apparatus from the top of the slope to the bottom of the slope pulls the one or more leaching lines down the slope and deploys the one or more leaching lines vertically onto the surface of the slope.
|