| CPC H04L 47/125 (2013.01) [H04L 12/4633 (2013.01); H04L 45/26 (2013.01)] | 20 Claims |

|
1. A first node, comprising:
a memory configured to store executable instructions; and
at least one processor coupled to the memory and configured to execute the executable instructions to cause the first node to:
obtain an operation, administration, and maintenance (OAM) packet, wherein the first node is an intermediate node between a head node of a first segment routing traffic engineering (SR-TE) tunnel and a tail node of the first SR-TE tunnel; and
obtain OAM information of a second SR-TE tunnel based on the OAM packet,
wherein the second SR-TE tunnel is between the head node and the intermediate node, and
wherein the second SR-TE tunnel is a part of the first SR-TE tunnel.
|