US 12,330,702 B2
Data processing for infrastructural monitoring
Ole Vorren, Munich (DE); and Olav Stetter, Munich (DE)
Assigned to KONUX GMBH, Munich (DE)
Appl. No. 18/042,542
Filed by KONUX GMBH, Munich (DE)
PCT Filed Aug. 26, 2021, PCT No. PCT/EP2021/073650
§ 371(c)(1), (2) Date Feb. 22, 2023,
PCT Pub. No. WO2022/043458, PCT Pub. Date Mar. 3, 2022.
Claims priority of application No. 20193665 (EP), filed on Aug. 31, 2020; and application No. 20212001 (EP), filed on Dec. 4, 2020.
Prior Publication US 2023/0331268 A1, Oct. 19, 2023
Int. Cl. B61L 27/70 (2022.01); B61L 15/00 (2006.01); B61L 25/02 (2006.01); B61L 27/53 (2022.01); B61L 27/57 (2022.01)
CPC B61L 27/70 (2022.01) [B61L 15/0081 (2013.01); B61L 25/023 (2013.01); B61L 27/53 (2022.01); B61L 27/57 (2022.01)] 15 Claims
OG exemplary drawing
 
1. A system, comprising:
a. at least one processing component;
b. a plurality of sensor nodes;
wherein, the processing component is configured to receive sensor data from the sensor nodes;
c. at least one trajectory module, wherein the trajectory module is configured to generate at least a part of trajectory data, based on sensor data; and
d. a sensor routine module, wherein the sensor routine module is configured to generate sensor installing data.