| CPC E21B 44/00 (2013.01) [E21B 7/04 (2013.01); E21B 47/0228 (2020.05); G01V 3/20 (2013.01); E21B 2200/20 (2020.05)] | 20 Claims |

|
1. A method comprising:
obtaining, via one or more sensors on a drilling assembly, measurement data of a subsurface formation while drilling a wellbore in the subsurface formation;
generating a horizontal resistivity model of the subsurface formation at respective depths along the wellbore based on the measurement data;
generating a vertical resistivity model of the subsurface formation at the respective depths along the wellbore based on the measurement data;
generating an effective resistivity at the respective depths along the wellbore based on the horizontal resistivity model and the vertical resistivity model to indicate a formation resistivity in each direction of the wellbore;
plotting the effective resistivity at the respective depths to generate a visualization of the effective resistivity in a user interface on a display device; and
steering a drill bit through the subsurface formation using the visualization of the effective resistivity.
|