CPC E21B 43/117 (2013.01) [E21B 29/10 (2013.01)] | 17 Claims |
1. A method of remediation in a subterranean formation having a borehole in which a first wellbore tubular is disposed at least partially within a second wellbore tubular, and wherein a cement body connects the first wellbore tubular to the second wellbore tubular, comprising:
positioning a well tool in a bore of the first wellbore tubular, the well tool having at least one shaped charge and at least one propellant body disposed inside a carrier;
detonating the shaped charge to generate a jet that forms an opening in the carrier, the first wellbore tubular, and a tunnel at least partially in the cement body, but does not form an opening in the second wellbore tubular;
igniting the propellant body to generate a gas at a volume and pressure selected to disintegrate the cement body; and
washing out the disintegrated cement body.
|