| CPC E21B 33/13 (2013.01) [B28C 9/004 (2013.01); E21B 7/00 (2013.01); E21B 21/062 (2013.01); E21B 21/08 (2013.01)] | 20 Claims |

|
1. A method performed at a wellsite, the method comprising:
providing a mud pump assembly with mud pumps positioned on a rig located at the wellsite;
operating the mud pumps to perform a mud pumping operation by pumping mud from a mud supply through the mud pumps to a mud outlet of the mud pump assembly to provide the mud downhole during drilling of a borehole;
clearing the mud from the mud pump assembly by flowing a flushing fluid through a flush out line of a suction manifold of the mud pump assembly to a cleanout port of the mud pump assembly; and
subsequently operating the mud pumps to perform a cementing operation by pumping cementing fluid from a cementing supply through the mud pumps to a cement outlet of the mud pump assembly to provide the cementing fluid downhole to cement casing in the borehole, thus utilizing the same mud pumps to pump the mud for the mud pumping operation and to pump the cementing fluid for the cementing operation.
|