CPC F03D 7/048 (2013.01) [F03D 17/00 (2016.05); G01M 9/065 (2013.01); F05B 2260/821 (2013.01); F05B 2270/204 (2020.08); F05B 2270/32 (2013.01); F05B 2270/321 (2013.01)] | 14 Claims |
14. A wind park, comprising:
plural wind turbines including a downstream wind turbine and a plurality of upstream wind turbines that are upstream from the downstream wind turbine; and an arrangement for estimating free-stream inflow communicatively connected to the plural wind turbines, the arrangement comprising:
a server or wind park controller adapted to select, from the plurality of upstream wind turbines, an upstream wind turbine based on a currently determined wind direction; and
a wind measurement system of the selected upstream wind turbine adapted to determine the free-stream inflow at the downstream wind turbine by utilizing free-stream inflow at the upstream wind turbine and correcting it with a time delay calculated from the wind speed, wind direction and a distance between the upstream wind turbine and the downstream wind turbine, wherein the server or wind park controller is configured to control the rotor speed and/or blade pitch of the downstream wind turbine based on the determined free-stream inflow.
|