CPC E04B 2/965 (2013.01) [E04B 1/3483 (2013.01); E04B 1/6813 (2013.01); E04B 2/967 (2013.01)] | 18 Claims |
1. A modular curtain wall, comprising:
a steel structure module including a steel structure body and a mount disposed on the steel structure body;
a curtain wall module including a curtain wall body, a hook disposed on the curtain wall body, and a first seal, the hook being corresponding to the mount, the hook being used to be hung on the mount such that the curtain wall body is fixed to the steel structure body, the first seal being disposed at left and right ends of the curtain wall body;
a first waterproof member being used to be disposed in a splicing gap between the adjacent curtain wall modules when at least two curtain wall modules are spliced in a left-right direction of the steel structure body, the first seal abutting against the first waterproof member to seal the splicing gap;
wherein when the hook is hung on the mount, the relative position between the curtain wall body and the steel structure body is adjustable in a front-back direction, the left-right direction, and an up-down direction of the steel structure body.
|