| CPC G06F 1/206 (2013.01) [H05K 7/20136 (2013.01); H05K 7/20236 (2013.01)] | 20 Claims |

|
1. A validation method configured to validate immersion-cooled servers in an air cooling environment, a supply voltage required for each of the immersion-cooled servers being a first voltage, the method being applied on a demo board, the method comprising:
obtaining a requirement order, the requirement order comprising types of immersion-cooled servers and a required number of the immersion-cooled servers;
building a validation environment according to the types of the immersion-cooled servers and the required number of the immersion-cooled servers; the validation environment comprising a first number of first fans and a second number of air cooling power modules; a supply voltage required for each of the first fans being the first voltage; the first fans being configured to dissipate heat from the immersion-cooled servers when the immersion-cooled servers are operating; each of the air cooling power modules comprising a power supply unit and a second fan; the power supply units being configured to provide electric power to the immersion-cooled servers and the first fans; the second fans being configured to dissipate heat from the power supply units when the power supply units are operating;
executing one or more tests in an assembled validation environment; the assembled validation environment comprising a plurality of first interfaces of the demo board coupled to the immersion-cooled servers, a plurality of second interfaces of the demo board coupled to the first fans, and a plurality of third interfaces of the demo board coupled to the air cooling power modules; the one or more tests comprising a test for testing a power consumption and a heat dissipation of the immersion-cooled servers; and
generating a result of test.
|