US 12,314,097 B2
Validation method, demo board, validation system, and non-transitory storage medium
Li-Quan He, Tianjin (CN); Duo Qiu, Tianjin (CN); and Wei-Chen Lin, New Taipei (TW)
Assigned to Fulian Precision Electronics (Tianjin) Co., LTD., Tianjin (CN)
Filed by Fulian Precision Electronics (Tianjin) Co., LTD., Tianjin (CN)
Filed on Nov. 30, 2022, as Appl. No. 18/072,555.
Claims priority of application No. 202210493901.3 (CN), filed on Apr. 28, 2022.
Prior Publication US 2023/0354549 A1, Nov. 2, 2023
Int. Cl. G06F 1/20 (2006.01); H05K 7/20 (2006.01)
CPC G06F 1/206 (2013.01) [H05K 7/20136 (2013.01); H05K 7/20236 (2013.01)] 20 Claims
OG exemplary drawing
 
1. A validation method configured to validate immersion-cooled servers in an air cooling environment, a supply voltage required for each of the immersion-cooled servers being a first voltage, the method being applied on a demo board, the method comprising:
obtaining a requirement order, the requirement order comprising types of immersion-cooled servers and a required number of the immersion-cooled servers;
building a validation environment according to the types of the immersion-cooled servers and the required number of the immersion-cooled servers; the validation environment comprising a first number of first fans and a second number of air cooling power modules; a supply voltage required for each of the first fans being the first voltage; the first fans being configured to dissipate heat from the immersion-cooled servers when the immersion-cooled servers are operating; each of the air cooling power modules comprising a power supply unit and a second fan; the power supply units being configured to provide electric power to the immersion-cooled servers and the first fans; the second fans being configured to dissipate heat from the power supply units when the power supply units are operating;
executing one or more tests in an assembled validation environment; the assembled validation environment comprising a plurality of first interfaces of the demo board coupled to the immersion-cooled servers, a plurality of second interfaces of the demo board coupled to the first fans, and a plurality of third interfaces of the demo board coupled to the air cooling power modules; the one or more tests comprising a test for testing a power consumption and a heat dissipation of the immersion-cooled servers; and
generating a result of test.