| CPC G05B 15/02 (2013.01) [G01C 21/20 (2013.01); G06Q 10/20 (2013.01); G06Q 30/018 (2013.01); G06Q 40/08 (2013.01); G06Q 50/163 (2013.01); G06V 40/172 (2022.01); G08B 1/02 (2013.01); G08B 7/062 (2013.01); G08B 7/066 (2013.01); G08B 13/22 (2013.01); G08B 17/10 (2013.01); G08B 21/02 (2013.01); G08B 21/043 (2013.01); G08B 21/0446 (2013.01); G08B 21/0461 (2013.01); G08B 21/182 (2013.01); G08B 21/185 (2013.01); H04L 12/2818 (2013.01); H04L 12/2825 (2013.01); H04L 12/283 (2013.01); H04L 67/12 (2013.01); H04N 23/661 (2023.01); H04W 4/02 (2013.01); H04W 4/024 (2018.02); G08B 21/0453 (2013.01); H04W 4/90 (2018.02)] | 20 Claims |

|
1. A computer-implemented method of monitoring device electrical usage within a property, the property populated with a hardware controller in communication with a plurality of devices, the method comprising:
analyzing, by one or more processors of the hardware controller, (i) electrical usage data from a device disposed within the property and (ii) audio data corresponding to noise generated during operation of the device to determine that the device is outputting more than a threshold level of power;
in response to determining that the device is outputting more than the threshold level of power, generating, by the one or more processors, a command to reduce a power output of the device; and
sending the command to the hardware controller, wherein the hardware controller causes the device to reduce the power output.
|