| CPC E21B 10/64 (2013.01) [E21B 7/061 (2013.01); E21B 10/602 (2013.01); E21B 10/62 (2013.01); E21B 41/0035 (2013.01)] | 33 Claims |

|
24. A method for forming a well system, comprising:
forming a main wellbore within a subterranean formation; and
positioning a two part drilling and running tool within the main wellbore, the two part drilling and running tool coupled to a whipstock assembly using a coupling mechanism, the two part drilling and running tool including:
a conveyance;
a smaller assembly coupled to an end of the conveyance, wherein the smaller assembly is a smaller bit assembly including one or more blades and one or more cutting features along a nose thereof; and
a larger bit assembly slidably coupled to the conveyance, the smaller assembly and larger bit assembly configured to slidingly engage one another downhole to form a combined bit assembly.
|