| CPC A63B 26/003 (2013.01) [A63B 9/00 (2013.01); A63B 23/10 (2013.01); E01C 13/00 (2013.01); A63B 2009/006 (2013.01); A63B 2208/12 (2013.01); A63B 2209/00 (2013.01); A63B 2244/087 (2013.01)] | 12 Claims |

|
1. A play structure for a playground system, comprising:
an inner molded unit made of poured-in-place (PIP) rubber subsurface poured with a mixture of rubber buffing and urethane configured to deliver improved safety, playability, and reduced maintenance requirement, wherein the rubber buffing is styrene butadiene rubber (SBR) buffing, and
a synthetic outer layer made of ethylene propylene diene monomer (EPDM) rubber, adhered to an outer surface of the inner molded unit,
wherein the play structure is shaped to develop balance and coordination in toddlers.
|