US 11,991,647 B2
Uplink power control
Ebrahim MolavianJazi, Lincolnwood, IL (US); Vijay Nangia, Woodridge, IL (US); Hyejung Jung, Northbrook, IL (US); Colin D. Frank, Park Ridge, IL (US); Robert T. Love, Barrington, IL (US); Ravi Kuchibhotla, Chicago, IL (US); and Hossein Bagheri, Urbana, IL (US)
Assigned to Lenovo (Singapore) Pte. Ltd., New Tech Park (SG)
Filed by Lenovo (Singapore) PTE. LTD., New Tech Park (SG)
Filed on Aug. 8, 2022, as Appl. No. 17/883,431.
Application 17/883,431 is a continuation of application No. 17/207,619, filed on Mar. 20, 2021, granted, now 11,419,067.
Application 17/207,619 is a continuation of application No. 16/876,653, filed on May 18, 2020, granted, now 10,986,593, issued on Apr. 20, 2021.
Application 16/876,653 is a continuation of application No. 16/150,222, filed on Oct. 2, 2018, granted, now 10,660,048, issued on May 18, 2020.
Claims priority of provisional application 62/567,133, filed on Oct. 2, 2017.
Prior Publication US 2022/0377676 A1, Nov. 24, 2022
Int. Cl. H04W 72/121 (2023.01); H04B 7/0426 (2017.01); H04B 7/06 (2006.01); H04B 7/08 (2006.01); H04L 5/00 (2006.01); H04W 16/28 (2009.01); H04W 52/08 (2009.01); H04W 52/10 (2009.01); H04W 52/14 (2009.01); H04W 52/24 (2009.01); H04W 52/32 (2009.01); H04W 52/36 (2009.01); H04W 72/044 (2023.01); H04W 72/12 (2023.01); H04W 72/1268 (2023.01); H04W 72/23 (2023.01)
CPC H04W 52/365 (2013.01) [H04B 7/0426 (2013.01); H04B 7/0617 (2013.01); H04B 7/0626 (2013.01); H04B 7/0695 (2013.01); H04B 7/088 (2013.01); H04L 5/0023 (2013.01); H04L 5/0048 (2013.01); H04L 5/0051 (2013.01); H04W 16/28 (2013.01); H04W 52/08 (2013.01); H04W 52/10 (2013.01); H04W 52/146 (2013.01); H04W 52/242 (2013.01); H04W 52/248 (2013.01); H04W 52/325 (2013.01); H04W 52/362 (2013.01); H04W 52/367 (2013.01); H04W 72/046 (2013.01); H04W 72/0473 (2013.01); H04W 72/12 (2013.01); H04W 72/121 (2013.01); H04W 72/1268 (2013.01); H04W 72/23 (2023.01)] 20 Claims
OG exemplary drawing
 
1. A user equipment (UE), comprising:
at least one memory; and
at least one processor coupled with the at least one memory and configured to cause the UE to:
receive a configuration associated with a set of downlink reference signal resources;
receive a downlink control information (DCI) scheduling an uplink transmission associated with a downlink reference signal resource of the set of downlink reference signal resources;
determine a beam pattern for the uplink transmission based at least in part on the DCI and a downlink pathloss measurement of a corresponding beam pattern associated with the downlink reference signal resource;
determine a transmit power for the uplink transmission based at least in part on a configured maximum output power for the uplink transmission, wherein the configured maximum output power is based at least in part on a maximum power reduction for the uplink transmission; and
perform the uplink transmission according to the beam pattern and the transmit power.