US 11,989,780 B2
Business method, apparatus and system for managing data, analytics and associated financial transactions for environmental, engineered and natural systems
Pusker Regmi, Rockville, MD (US); Daniel Medina, Silver Spring, MD (US); Kieran Iyengar, Herndon, VA (US); Sudhir Murthy, Herndon, VA (US); and James Clarke, Washington, DC (US)
Assigned to WaterwAIs Inc., Herndon, VA (US)
Filed by Resilience Financing Inc., Middletown, DE (US)
Filed on Jun. 25, 2020, as Appl. No. 16/912,667.
Claims priority of provisional application 62/866,590, filed on Jun. 25, 2019.
Prior Publication US 2020/0410590 A1, Dec. 31, 2020
Int. Cl. G06Q 40/04 (2012.01); B64C 39/02 (2023.01); G01N 33/00 (2006.01); G01N 33/18 (2006.01); G01N 33/24 (2006.01); G01N 33/38 (2006.01); G06F 16/23 (2019.01); G06Q 10/0635 (2023.01); G06Q 10/10 (2023.01); G06Q 20/08 (2012.01); G06Q 20/36 (2012.01); G06Q 30/012 (2023.01); G06Q 30/018 (2023.01); G06Q 30/0282 (2023.01); G06Q 40/02 (2023.01); G06Q 40/08 (2012.01); G06Q 40/10 (2023.01); G06Q 40/12 (2023.01); G06Q 50/02 (2012.01); G06Q 50/06 (2012.01); G06Q 50/16 (2012.01); G06Q 50/26 (2012.01); H04L 69/324 (2022.01); B64U 101/00 (2023.01)
CPC G06Q 40/04 (2013.01) [B64C 39/024 (2013.01); G01N 33/0004 (2013.01); G01N 33/18 (2013.01); G01N 33/24 (2013.01); G01N 33/383 (2013.01); G06F 16/2379 (2019.01); G06Q 10/0635 (2013.01); G06Q 10/10 (2013.01); G06Q 20/085 (2013.01); G06Q 20/3678 (2013.01); G06Q 30/012 (2013.01); G06Q 30/018 (2013.01); G06Q 30/0282 (2013.01); G06Q 40/02 (2013.01); G06Q 40/08 (2013.01); G06Q 40/10 (2013.01); G06Q 40/12 (2013.12); G06Q 50/02 (2013.01); G06Q 50/06 (2013.01); G06Q 50/16 (2013.01); G06Q 50/26 (2013.01); H04L 69/324 (2013.01); B64U 2101/00 (2023.01)] 8 Claims
OG exemplary drawing
 
1. A system comprising:
one or more sensors, and one or more engineered infrastructure or infrastructures in a watershed or airshed that is subject to real world events consisting of a pollutant load or a hazard, the one or more sensors measuring the pollutant load or hazard in one or more of engineered infrastructure, infrastructures, or the environment of the watershed or airshed, wherein the engineered infrastructure reduces the risk of the pollutant load or hazard in the environment of the watershed or airshed; and
one or more computing devices that contains storage devices, random access memory (RAM), and computer processing unit (CPU), the one or more computing devices configured to
receive data regarding the reduction of risk, including mitigation or adaptation with one or more engineered infrastructure or infrastructures of the measured pollutant load or hazard within the watershed or airshed from the one or more sensors; determine using a mathematical model or from analysis, a prediction of performance of the one or more engineered infrastructure, with the prediction of performance resulting in one or more triggers that incentivizes the performance of the one or more engineered infrastructure or a payout between two parties,
evaluate whether or not one or more present triggers for the risk or the reduction of risk, of the pollutant load or hazard in the environment of the watershed or airshed, has been met within a specific timeframe or upon the occurrence of a detected event based on the data from one or more sensors measuring the pollutant load or hazard regarding mitigation or adaptation of the measured pollutant load or hazard within the watershed or airshed from the one or more sensors in comparison with the mathematical model or analytical prediction of performance;
based on a determination that the one or more preset triggers, set using the mathematical model or analytical prediction of performance, has been met or not met based on this comparison, generate a token or tokens within a blockchain; and
provide a valuation of the generated token or tokens based on the data regarding mitigation or adaptation of the measured pollutant load or hazard within the watershed or airshed from the one or more sensors with the prediction,
the valuation of such token or tokens incentivizing a payout between two or more parties, or incentivizing the improvement in performance of the engineered infrastructure.