US 11,989,069 B2
Power distribution management based on distributed networking protocol analytics
David Michael King, Sudbury, MA (US); and Robert Dean King, Sudbury, MA (US)
Assigned to DMK Nano LLC, Sudbury, MA (US)
Appl. No. 17/424,848
Filed by DMK Nano LLC, Sudbury, MA (US)
PCT Filed Jan. 21, 2020, PCT No. PCT/US2020/014474
§ 371(c)(1), (2) Date Jul. 21, 2021,
PCT Pub. No. WO2020/154326, PCT Pub. Date Jul. 30, 2020.
Claims priority of provisional application 62/795,399, filed on Jan. 22, 2019.
Prior Publication US 2022/0121260 A1, Apr. 21, 2022
Int. Cl. G06F 1/26 (2006.01); G06F 1/28 (2006.01); G06F 1/30 (2006.01); H02J 3/00 (2006.01); H02J 3/38 (2006.01)
CPC G06F 1/28 (2013.01) [G06F 1/305 (2013.01); H02J 3/007 (2020.01); H02J 3/381 (2013.01)] 32 Claims
OG exemplary drawing
 
1. A system for managing the distribution of generated electrical power, comprising:
one or more processors in communication with an electrical power generation device or an electrical grid, an electrical power consumption device, an electrical energy storage device, and an electrical transmission device, the one or more processors coupled to memory and configured to:
maintain, in one or more data structures, a status of each account of a plurality of accounts, each account of the plurality of accounts corresponding to a respective device of the electrical power generation device, the electrical power consumption device, the electrical energy storage device, and the electrical transmission device, the account including one or more record objects corresponding to a respective unit of power or energy;
generate a first record object responsive to the electrical power generation device generating a first unit of power, the first record object identifying an identifier of the electrical power generation device and a first value corresponding to a voltage associated with the first unit of power and a second value corresponding to a current associated with the first unit of power;
update a first account of the plurality of accounts corresponding to the electrical power generation device by associating the first record object to the first account;
identify, from a plurality of paths, a first path along which to transmit the first unit of power, each path of the plurality of paths identifying the electrical power generation device as a source device and a respective one of the electrical power consumption device, the electrical energy storage device, or the electrical transmission device as a destination device, the first path identified based on the status of a respective account of the plurality of accounts corresponding to the one of the electrical power consumption device, the electrical power storage device, or the electrical transmission device;
generate a control signal to route the first unit of power from the source device to the destination device of the first path;
update an event tracker maintained by the one or more processors responsive to routing the first unit of power by including an event indicating the routing of the first unit of power from the source device to the destination device;
generate a second record object corresponding to the first unit of power routed to the destination device, the second record object identifying a second identifier of the destination device; and
update a second account of the plurality of accounts to include the second record object based on routing the first unit of power to the destination device, the second account corresponding to the destination device.