CPC G02B 6/3835 (2013.01) [G02B 6/475 (2023.05); H02G 1/14 (2013.01); H02G 3/22 (2013.01); H02G 15/08 (2013.01); H05K 9/0009 (2013.01); H05K 9/0018 (2013.01); G02B 6/38 (2013.01); G02B 6/4248 (2013.01); G02B 6/4277 (2013.01); G02B 6/4436 (2013.01)] | 17 Claims |
1. A transition for an optical fibre cable through a partition, wherein the transition comprises an electrically conductive frame, a shield pipe and a compressible holding module configured to have a sealing property, wherein the optical fibre cable is received inside the shield pipe, wherein the shield pipe comprises an electrically conductive material, wherein one end of the shield pipe is received inside the holding module and that the shield pipe is received in an axial through opening of the holding module, and wherein the shield pipe placed in the holding module is in electrical contact with the frame.
|