CPC F01K 25/005 (2013.01) [F01K 3/20 (2013.01); F01K 3/262 (2013.01); F01K 7/18 (2013.01); F01K 9/00 (2013.01)] | 20 Claims |
1. A power plant comprising:
a hydrogen fuel supply;
an oxygen fuel supply;
a water supply;
a boiler comprising:
a burner for combusting hydrogen from the hydrogen fuel supply and oxygen from the oxygen fuel supply to produce heat and combustion products with a combustion process;
a first heat exchanger configured to heat water from the water supply to generate high-pressure steam; and
a second heat exchanger; and
a steam turbine comprising:
a first turbine configured to be driven only with the high-pressure steam from the first heat exchanger to provide input to a first electrical generator and to deliver a first stream of expanded high-pressure steam to the boiler for generating low pressure steam in the combustion process and a second stream of expanded high-pressure steam to the second heat exchanger; and
a second turbine configured to be driven by intermediate-pressure steam from the second heat exchanger and low-pressure steam from the boiler, wherein the intermediate-pressure steam and the low-pressure steam are introduced into an inlet of the second turbine.
|