CPC E21B 10/26 (2013.01) [E21B 33/14 (2013.01); E21D 5/01 (2013.01)] | 15 Claims |
9. A method of creating and shoring a work hole in the ground, comprising:
excavating soil from the ground to form a hole having a sidewall and with a bottom defining a floor below ground level with a perimeter edge, and to form a channel extending around the perimeter edge of the floor and below the floor;
the floor and the channel being formed using a single drilling bit;
supplying water to the hole during excavation to retain the soil in the sidewall; and then installing a shoring ring into the hole, the shoring ring having a lower end residing in the channel.
|