CPC E04H 12/348 (2013.01) [E04G 23/081 (2013.01); E04G 23/082 (2013.01); E04G 23/084 (2013.01); E04H 12/12 (2013.01); F03D 80/00 (2016.05); E04G 2023/087 (2013.01); F05B 2230/70 (2013.01)] | 14 Claims |
1. A method for disassembling a tower of a wind power plant, the method comprising:
selecting disassembly measures as a function of a location of the tower and characteristics of the tower;
preparing the disassembly of the tower;
separating tendons, wherein separating the tendons comprises:
relaxing externally guided tendons;
separating externally guided tendons at a top of the tower or on the base of the tower; and
removing and winding the externally guided tendons using a drum-reeling apparatus;
carrying out the disassembly of the tower;
transporting the disassembled tower away; and
removing coatings on the tower using one or more components from a list comprising a high-pressure water jet, an abrading installation, and a suction installation.
|