CPC B66B 1/3492 (2013.01) [B66B 5/0018 (2013.01)] | 6 Claims |
1. A method of monitoring a direction of motion of a conveyance apparatus within a conveyance system, the method comprising:
detecting a first height of the conveyance apparatus at a first time;
detecting a second height of the conveyance apparatus at a first selected time period prior to the first time;
detecting a height change of the conveyance apparatus within the conveyance system in response to the first height and the second height;
determining whether the height change is greater than a first selected height change;
determining that the conveyance apparatus is moving in an upward direction when the height change is greater than the first selected height change;
applying an upward corrective value to shift the first time and the first time period prior to the first time; and
determining that the conveyance apparatus was moving in the upward direction in a time period between the first time minus the upward corrective value and the first selected time period prior to the first time minus the upward corrective value.
|