CPC B22F 12/30 (2021.01) [B22F 10/28 (2021.01); B22F 12/88 (2021.01); B29C 64/153 (2017.08); B29C 64/245 (2017.08); B33Y 10/00 (2014.12); B33Y 30/00 (2014.12)] | 21 Claims |
1. An apparatus for fabricating a three-dimensional structure from a representation of the structure stored in memory, the apparatus comprising:
a build platform having an upper surface and a lower surface with a build gap defined through the build platform from the upper surface to the lower surface;
a base plate initially supported along the lower surface of the build platform such that an edge of the base plate extends along and closes off the build gap;
a powder delivery assembly configured to supply powder to the build gap;
at least one directed energy source positioned above the build platform, the at least one directed energy source configured to apply directed energy to at least a portion of the build gap to form a layer of the three-dimensional structure; and
an advancement assembly positioned below the lower surface of the build platform, the advancement assembly is configured to selectively engage with the base plate and/or the three-dimensional structure to hold the base plate and the three-dimensional structure in a fixed position during forming of the layer and to advance the base plate and the three-dimensional structure further below the lower surface of the build platform once the layer is formed, wherein after advancement over a first given distance, the advancement assembly directly engages the three-dimensional structure.
|